1. Evaluations were related to rounds. Is it possible to add the interaction between these two to monitor the change?
2. Ratings at the second would be centered around the average due to feedbacks. It would be more appropriate to constraint the average of evaluations at zero, rather than the mean of the 2 rounds at zero.